Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Synchronising and Paralleling Studies Guide

How to study generator synchronising and paralleling: matching conditions, breaker closing, load sharing, circulating currents, reverse power, protection settings and failure modes.

In short. Paralleling two sources is safe only when voltage, frequency, phase angle and sequence match at the instant of closing. After closing, sets must share kW and kVAr correctly. The study defines the matching windows, the controls, the protection and what happens if any part fails.

Closing conditions

ConditionWhy it matters
Phase sequenceWrong sequence causes a short circuit
VoltageDifference drives reactive circulating current
FrequencyDifference makes the angle drift; slip should be small
Phase angleLarge angle at closing gives a mechanical and electrical shock

Controllers use a check-sync window on voltage, slip and angle, with a breaker closing time compensation so that contacts meet at zero angle.

After closing

Study steps

  1. List the sources and the busbar arrangement.
  2. Define sync windows from set and breaker data. See synchronisation.
  3. Check breaker closing and withstand ratings for the paralleled fault level.
  4. Calculate expected sharing and verify governor and AVR settings.
  5. Set protection: reverse power, loss of excitation, over-current, sync-check relay.
  6. Define failure responses: failed sync, bus dead, set trip, controller loss.
  7. Commission with a witnessed test sequence. See synchronising switchgear.

Dead-bus and utility parallel

For dead-bus closing, interlocks must prevent two sets closing on the dead bus at once. For utility parallel, the utility may impose protection and export rules. See interconnection study.

Illustrative example

Two 1,000 kVA sets share a bus. On test, one set takes 70 percent of the kW because its governor droop was set differently. The study confirms the cause, standardises the droop and verifies sharing within a few percent across the load range.

Scope of a paralleling study

Before generators share a bus, the study confirms they can synchronise, share load stably and survive a fault together.

TopicCheck
Machine compatibilityMatching voltage, frequency, phase sequence, governor and AVR types
Pitch of windingsDifferent winding pitches in paralleled alternators influence third-harmonic circulating current
Fault levelAll sets plus utility define bus rating
Load sharingkW through governors, kVAr through AVR droop or cross-current compensation
ProtectionReverse power, loss of excitation, differential
Dead-bus logicWho closes first

Circulating currents

Unequal excitation causes reactive current to circulate between machines. Unequal winding pitch causes third-harmonic circulating current through the neutral. Both are avoided by matched machines and, where needed, by neutral treatment.

Stability

Machines must hold synchronism through a disturbance such as a fault or large load step. Governor hunting, mismatched droop and weak ties can cause oscillation. Transient simulation tests the response.

Utility paralleling

If paralleling with utility is intended, add interconnection study and utility approval. See utility-DG interconnection.

See synchronisation and synchronising switchgear.

Common mistakes

What to send us

Send set data and the paralleling controller. Send your application details.

Questions engineers ask

What happens if closed out of phase?

High current and torque can damage the alternator, coupling and breaker.

Can different sizes be paralleled?

Yes, with proper sharing settings and protection.

What is droop?

A characteristic where frequency or voltage falls slightly with load so sets share it.

Do I need synch relays and a controller?

Modern controllers include both, but an independent check-sync relay adds safety.

This guide gives general principles. Follow manufacturer instructions and safety practice.