Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Electrical Study Inputs, Assumptions and Validation Guide

What data an electrical study needs, how to record assumptions, how to validate inputs against measurement and nameplates, and how to document sensitivity so results can be trusted and reviewed.

In short. A study is only as good as its inputs. Every study should list the data used, where it came from, what was assumed and how it was checked. Validation against nameplates and measurements, and a sensitivity check on the weakest assumptions, are what make the result defensible.

Input checklist

GroupData
NetworkSingle-line diagram, voltage levels, utility fault level and X/R, operating modes
SourcesGenerator ratings, reactances, excitation, governor data, UPS and BESS data
TransformerskVA, impedance, vector group, tap, losses
Cables and busbarsType, size, length, route, ratings
LoadskW, power factor, starting method, duty, harmonic data
ProtectionDevice types, models and settings
SiteAltitude, temperature, soil resistivity

Assumption register

For each assumption, record: the value, the reason, the source, the owner who can confirm it and the effect on the result if it is wrong. Mark each as confirmed, estimated or unknown.

Validation techniques

  1. Nameplate check. Compare model data with photographs of equipment.
  2. Typical value check. Compare with typical ranges for similar equipment. Flag outliers.
  3. Measurement check. Compare load flow or voltage drop results with measured values at selected points.
  4. Reasonableness check. Hand calculation at a few points to confirm the software.
  5. Peer review. A second engineer reviews inputs, not just results.

Sensitivity

Vary the least certain inputs through a plausible range, such as utility fault level, motor starting current or cable length, and see if the conclusion changes. If it does, the input needs better data before the decision.

Reporting

Illustrative example

A short-circuit study assumes a utility fault level from an old letter. A quick check with the utility finds the level is now higher after a new substation. The study is rerun, and one feeder breaker is found to be under-rated. A sensitivity case for future growth in fault level is also added to the report. See utility fault level.

Garbage in, confident garbage out

Software produces precise-looking numbers from imprecise inputs. A study is only as good as its data and the honesty of its assumptions.

InputPreferred sourceFallback and risk
Utility fault levelWritten statement from the distribution companyEstimate; state conservative case
Transformer impedanceTest certificateNameplate or typical value
Generator reactancesManufacturer data sheetTypical values; flag in report
Cable lengthsMeasured on siteDrawing lengths, often short
Load dataLogged measurementsNameplate with demand factors
Protection settingsDownloaded from the relayPaper records, possibly outdated

Assumptions register

Keep a list of every assumption with an owner, a source and a date to verify. Each assumption should also state the effect if it is wrong, and whether the conservative direction was chosen.

Validation techniques

  1. Compare computed load flow with measured voltages and currents.
  2. Compare computed fault level with utility statements or past records.
  3. Run a sanity check by hand on one bus.
  4. Peer review by a second engineer.
  5. Sensitivity runs on the least certain inputs.

Version control

Identify model version, date, data revision and software version on the report. See brownfield study.

Common mistakes

What to send us

Send the data you have and flag what you do not. Send your application details.

Questions engineers ask

What if data is missing?

Use typical values, label them as assumed and test sensitivity.

How accurate must inputs be?

Accurate enough that conclusions do not change within the plausible range.

Who owns assumptions?

The person who can confirm them, usually the client or equipment owner.

Should I keep model files?

Yes, with version control, so studies can be repeated after changes.

This guide gives general principles. Every study must be reviewed by a qualified engineer.

CallWhatsAppEnquire