Protection and Coordination Study Requirement Selection Guide

How to decide which protection studies a site needs: coordination, selectivity, arc-flash, generator and transformer protection, with triggers, inputs and expected outputs.

In short. Protection studies turn fault levels into settings. A coordination study sets devices so the one nearest a fault trips first. Arc-flash and generator protection studies address specific risks. Use the triggers here to decide what your site needs, and make sure the short-circuit study comes first.

Studies and what they answer

StudyQuestion it answers
Short-circuitWhat fault currents can occur? Are ratings adequate?
Protection coordinationDo devices trip in the right order and time?
Arc-flashWhat incident energy could a person face, and how to reduce it?
Generator protection settingsAre generator functions set correctly for its role?
Transformer and bus protectionAre unit protections suitable and selective?
Earth-fault and earthingAre earth faults detected and cleared safely?

Triggers

Selection flow

  1. Is the short-circuit study current? If not, do it first. See short-circuit screening.
  2. Do you have multiple protection levels in series? Then coordination is needed.
  3. Do people work on or near live equipment? Then arc-flash is needed.
  4. Do you have generators, especially in parallel or with a utility? Then generator protection settings are needed. See generator protection relays.
  5. Are there islanded or low-fault-level modes? Then check protection sensitivity.

Inputs

Outputs

Worked illustration

A site added a generator and now sees the main breaker trip for feeder faults. The triggers (new source, loss of selectivity) point to a coordination study and a generator protection review. The short-circuit study is updated first with the generator’s contribution. The coordination study then sets the feeder, board and incomer times, and the arc-flash study confirms energy levels at the board. The sequence matters because each study depends on the previous.

Selecting the level of coordination work

SituationRecommended work
Single generator and ATS, simple radial boardCheck breaker settings and manufacturer selectivity tables
Multiple levels of adjustable breakers or relaysTime-current coordination study
Generators in parallelCoordination for each source combination, generator protection settings
Paralleling with the utilityInterconnection protection study
Medium voltage systemFull relay setting and coordination study
Arc-flash concernsCoordination plus arc-flash study
Frequent nuisance trips or unexplained tripsReview settings against measured events

Warning signs that a study is needed

  1. A trip at a main breaker for a fault on a small circuit.
  2. No trip on a known fault, only a distant breaker clearing.
  3. Generator-only operation causing trips that mains operation does not.
  4. Recent additions of sources or loads with no setting review.

Inputs required

See coordination study workflow and coordination and selectivity.

Common mistakes

What to send us

Send the single-line diagram, relay data and the problem you see. Send your application details. See also coordination study workflow.

Questions engineers ask

What is protection coordination?

Setting devices so the one closest to a fault trips first, leaving the rest in service.

Is an arc-flash study required?

Often for safety programmes and standards. Requirements vary; check your rules.

Which comes first?

The short-circuit study, then coordination, then arc-flash.

How often should studies be updated?

After changes and at periodic reviews.

This guide gives general principles. Studies must be performed by qualified engineers using verified data.