Short-Circuit Study Requirement Screening Guide

How to decide whether a short-circuit study is needed and what it must cover: triggers such as new sources, ratings, paralleling, protection changes and the data to collect first.

In short. Every change that adds a source, changes impedance or paralleling, or raises equipment ratings can alter fault levels. A short-circuit study checks that switchgear, cables and protection can survive and clear the highest fault, and that protection still operates at the lowest. If any trigger below applies, a study is needed.

Why it matters

Triggers: when a study is needed

TriggerWhy
New or additional generator or transformerAdds fault contribution
Paralleling sources or closing a tieFault levels add
Utility supply changeSource impedance changes
Adding large motorsMotors contribute to the fault
Adding BESS, UPS or solar invertersInverter contribution and protection behaviour
Replacing or adding switchgearRatings must be verified
Changing protection settings or devicesSelectivity and clearing times
Island or microgrid operationLow fault levels
No up-to-date study existsUnknown margin

Data to collect

What the study produces

See short-circuit study architecture and IEC short-circuit calculation.

Quick screening view (illustrative)

A 1,250 kVA, 5 per cent impedance transformer can supply about 35 kA at 415 V to a bolted fault, before adding motor contribution and the source. If the downstream board’s breakers are rated 25 kA, a study is clearly needed. This is a screening estimate, not a design value. The study replaces the guess with a calculated answer.

After the study

Keep the model, assumptions and results with the single-line diagram. Update when anything changes. Feed results into the protection coordination study. See protection study selection.

Do you need a short-circuit study?

TriggerWhy it needs a study
Adding a generator in parallel with the utilityFault level rises
Paralleling several generatorsCombined contribution
Bus above about 30 to 50 kA, or unknownBreaker ratings uncertain
New or replaced transformerImpedance changes the level
Protection settings being set or changedNeeds minimum and maximum levels
Arc-flash labelling requirementRequires fault current data
Old plant with unknown ratingsSafety

Quick screen (illustrative)

For a 1,000 kVA, 5 percent transformer: rated current 1,391 A, fault current up to about 27.8 kA on an infinite source. If the board’s breakers are rated 25 kA, they are inadequate. The screen flags the need before any detailed work. Adding a 500 kVA generator with 15 percent reactance contributes about 4.6 kA, raising the total to about 32 kA.

What the full study provides

  1. Maximum levels for equipment ratings.
  2. Minimum levels for protection sensitivity.
  3. Peak and thermal values for bus bracing and cables.

Data to collect

Utility fault level, transformer data, generator reactances, motor contributions and cable lengths. See short-circuit study architecture and fault level engineering.

Common mistakes

What to send us

Send the single-line diagram, equipment data and utility details. Send your application details.

Questions engineers ask

Do I need a short-circuit study for a single generator?

If it connects to existing switchgear or a utility supply, check ratings and protection. For small systems a simple verification may suffice.

Why does the minimum fault level matter?

Protection must detect the smallest credible fault, such as on generator-only supply.

How often should it be updated?

Whenever the system changes, and on a periodic review.

Who performs the study?

A power systems engineer using recognised software and standards such as IEC 60909.

Figures are illustrative. A real study requires verified data.