Match the electrical problem to the study that answers it: tripping, voltage dip, overheating, harmonics, capacity, earthing, safety, redundancy or expansion, with data each needs.

In short. Start from the symptom, not the study name. Each electrical problem points to one or two studies that answer it. This guide maps common problems on generator and power systems to the right study, the question it answers and the data to prepare.

Problem to study

ProblemStudyQuestion it answers
Generator stalls or dips on a motor startMotor startingCan the source start the motor and hold voltage?
Breaker too small or too slowShort-circuit and TCC coordinationIs equipment rated and does the right device trip first?
Wrong generator sizeGenerator sizingDoes it carry load, motor start and steps?
Voltage low at far endCable and voltage drop, load flowWhere does voltage fall and why?
Overheating, UPS or drive faults on generatorHarmonic studyIs distortion within limits on generator supply?
Low power factor or capacitor troubleReactive powerHow much correction and is it safe on generator?
Shock risk, relay misoperationEarthing studyDo earth faults clear safely?
Worker safety at switchgearArc-flash studyWhat energy could a worker receive?
Transformer start trips the setInrush studyCan we energise without tripping?
Need for no outage or N+1Reliability studyWhat architecture meets the target?
Paralleling or utility interconnectionSynchronising, interconnectionSafe, approved parallel operation?
Adding load or sources laterExpansion studyWhat headroom do we need?
Old, undocumented siteBrownfield studyWhat is really there?

Choosing the order

  1. Verify the as-built system and loads.
  2. Run load flow and short-circuit as the foundation.
  3. Run the studies that use those results: coordination, arc flash, motor starting, harmonics.
  4. Run architecture studies: reliability, expansion, interconnection.
  5. Validate inputs and document assumptions. See inputs and validation.

How to prepare

Illustrative example

A plant reports that its new generator trips when the cooling tower motor starts, and the UPS alarms after transfer. The mapping suggests a motor starting study for the first symptom and a harmonic study for the second. The foundation work is a load list and the generator datasheet, and the coordination study follows once the cases pass.

From the problem you see to the study you need

Problem or questionStudy required
How large a generator do we need?Load list and demand, generator sizing and transient performance
Lights flicker or motors stall on generatorMotor starting and voltage dip, load-step and frequency response
Breaker rating questions after adding a sourceShort-circuit study, maximum and minimum
Unexpected trips or no trip on a faultProtection coordination, TCC
Safety of maintenance work on live boardsArc-flash study
Overheating, nuisance trips, capacitor failuresHarmonic and resonance study
Low power factor or generator unstable on capacitorsReactive power and power factor study
Voltage drop at far loadsLoad flow, cable sizing
Shock complaints, equipment damage in stormsEarthing, GPR, lightning and surge risk
Plan to parallel with the gridUtility-DG interconnection
Need to prove uptimeReliability, FMEA, redundancy study
Old plant, drawings unreliableBrownfield study
Facility expansion plannedCapacity expansion study

How to start

  1. State the question in one sentence.
  2. Choose the study from the table.
  3. Collect the data it needs.
  4. Agree acceptance criteria before running.

Often several studies are needed in sequence. See study inputs and validation.

For help scoping a study, use the application engineering enquiry.

Common mistakes

What to send us

Describe the symptom and send what you have. Send your application details.

Questions engineers ask

Do I need every study?

No. Choose by the problem and the risk.

Which study first?

Usually load flow and short-circuit, since others depend on them.

Can one study answer several problems?

Sometimes. For example, a good short-circuit study supports coordination and arc flash.

How do I know if the result is reliable?

Check the inputs, assumptions and sensitivity, and have it reviewed.

This guide gives general principles. Study scope should be agreed with a qualified engineer.