Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

UPS / STS / ATS Control Coordination

How UPS, static transfer switches and ATS interact: transfer timing, source acceptance windows, rectifier walk-in, battery recharge, bypass control and coordination tests for critical loads.

In short. The UPS protects the instant, the ATS protects the transfer, and the STS protects against source failure to dual-corded loads. They must be coordinated on timing, windows and settings. Most real failures happen at the interfaces, such as a UPS rejecting generator voltage.

Roles

DeviceRoleSpeed
UPSNo-break supply from batteryInstant
STSFast electronic transfer between two sourcesFraction of a cycle to a few milliseconds
ATSMechanical transfer between utility and generatorCycles to seconds

Coordination points

Generator mode in UPS settings

Many UPS have a generator mode that widens input tolerances, limits input current and extends walk-in. Check that it is enabled and set to match the generator’s behaviour. See integrated system studies.

Bypass hazards

Maintenance bypass operations are a high-risk area for human error. Use clear labelling, interlocks and a written sequence. See interlocking.

Integrated tests

  1. Utility failure with the UPS on battery.
  2. Generator start, acceptance and UPS transfer to generator.
  3. Battery recharge on generator.
  4. Utility return and retransfer.
  5. Failure of first start or STS source loss.

Record the time stamps. See transfer architecture.

Illustrative example

A data hall UPS rejects the generator input intermittently. The test shows the generator’s frequency overshoots briefly after loading. The UPS input window is widened with the manufacturer’s agreement, the rectifier walk-in is extended to 20 seconds, and the governor is tuned so the overshoot disappears.

Three devices, one load

DeviceRole
UPSHolds load through the interruption, battery-backed
Static transfer switch (STS)Switches the load between two sources in milliseconds
ATSMoves a bus between utility and generator in seconds

The UPS protects the instant; the generator protects the duration.

Sequence on mains failure (illustrative)

  1. Mains fails; UPS goes to battery in zero time.
  2. Generator starts and ATS transfers in 10 to 15 seconds.
  3. UPS input detects the generator, applies walk-in so its rectifier ramps load gradually over 5 to 30 seconds.
  4. UPS recharges the battery, increasing generator load.

Interaction hazards

Control coordination

Define the permissives: generator in window, walk-in enabled, charging current limited while on generator. The STS should transfer only to a source in sync, or accept a controlled break.

Test

Test the whole chain with real load: mains cut, generator start, transfer, UPS walk-in, return. See UPS and nonlinear loads and hybrid system studies.

The master engineering question

At each handover, does the next device accept what the previous one delivers, and what carries the load if it does not?

What to send us

Send UPS, ATS and generator data. Send your application details.

Questions engineers ask

Is an STS the same as an ATS?

No. An STS is electronic and much faster, for dual-source critical loads.

Why does the UPS keep rejecting the generator?

Voltage or frequency may be outside its window, or distorted.

Should the UPS recharge on generator?

Yes, at a controlled rate so the generator is not overloaded.

Who is responsible for coordination?

The project engineer, with input from each manufacturer.

This guide gives general principles. Follow manufacturer instructions.

CallWhatsAppEnquire