Primary and Secondary Injection Testing Guide

How injection testing proves protection: secondary versus primary injection, what each covers, test plans for pickup, timing and logic, safety, record keeping and typical findings.

In short. Secondary injection feeds simulated currents and voltages into a relay to prove its settings and logic. Primary injection passes real current through the primary circuit to prove CTs, wiring and relay together. Use secondary injection for relay function and primary injection for the end-to-end chain.

Comparison

AspectSecondary injectionPrimary injection
Where appliedRelay terminalsThrough the primary conductor or busbar
ProvesRelay pickup, timing, logic, outputsCT ratio, polarity, wiring, relay response, trip path
EquipmentRelay test setHigh-current injection set
Typical useEvery relay at commissioning and maintenanceNew installations, differential schemes, after CT work

Secondary injection plan

  1. Record as-found settings and compare with the approved sheet.
  2. Test pickup and dropout for each element.
  3. Test operating time at several multiples of pickup.
  4. Test directional and sequence elements with correct phase angles.
  5. Test logic: blocking, interlocks, setting groups, outputs and LEDs.
  6. Test the trip contact to the breaker, ideally by operating the breaker.
  7. Restore settings and record as-left values.

Primary injection plan

Safety

Typical findings

Illustrative example

Primary injection through a transformer differential scheme shows the differential current rising rather than cancelling. One CT’s polarity is reversed. Without the test, the relay would have tripped on the first load.

Two kinds of injection test

TestWhat is injectedWhat it proves
Secondary injectionCurrent and voltage into relay terminalsRelay settings, timing and output logic
Primary injectionHigh current through the primary circuitCT ratio, polarity, wiring, relay response end to end

Procedure outline

  1. Isolate and make safe; disable unintended trips or arrange them.
  2. Record as-found settings.
  3. Inject at 1.05, 1.5, 2 and several times pickup and confirm operating times against the curve.
  4. Check each output contact, alarm and trip.
  5. For primary tests, inject through the CT and confirm secondary current and relay reading.
  6. Restore, remove test connections, check CT shorting links are removed, and record as-left settings.

Acceptance (illustrative)

A relay set to trip at 100 A with a given curve is tested at 150 A, expecting a defined time. Measured time within the relay’s declared tolerance passes. Outside it, investigate.

Safety

Common faults found

Wrong polarity, incorrect ratio, CT shorting links left in, trip contacts not wired, and settings not as specified. See switchgear testing.

Common mistakes

What to send us

Send relay models and settings. Send your application details. See also switchgear testing.

Questions engineers ask

Is secondary injection enough?

For routine checks of the relay, yes. New installations also need primary injection or equivalent checks.

Why record as-found values?

To show drift or unauthorised changes and keep a history.

Can injection be done live?

Secondary injection on live equipment requires strict isolation of trip and CT circuits. Often planned outages are used.

How often should relays be tested?

At commissioning and at periodic intervals set by policy and the relay type.

This guide gives general principles. Follow equipment and test-set instructions.